> Portfolio > Plant Engineering
Plant Engineering
Portfolio
Project |
Period |
Content |
Client |
IPC/EVA 3D Modeling |
12.02~12.08 |
PDS, Microstation 3D Modeling |
Hanwha TechM |
Rabigh II Boiler Support 3D Modeling |
12.02~12.08 |
Support Modeling (PDS) |
JEONGWOO |
Taeahn Thermal Power Plant Boiler Pressure Part Design |
12.02~12.06 |
Pressure Part Detail Design |
SeenTec |
CETCO_Burner Boom Design |
12.02~12.04 |
Piping Design (2D, 3D - PDS) |
IJPS |
Youngheung #5,6 Boiler Support Modeling |
12.01~12.06 |
Support Modeling (PDS) |
UNISON e Tech |
Yanbu2 Boiler Support Modeling |
12.01~12.05 |
Support Modeling (PDS) |
UNISON e Tech |
KALINA Project 3D Modeling / Piping Design |
12.01~12.03 |
Piping Design (2D, 3D - PDS) |
Sungjin Geo Tec |
Equipment Modification |
12.01~12.02 |
Piping Design - Equipment Drawing (2D) |
IJPS |
Yangjoo HaengBock GT Piping Design |
11.12~12.01 |
Piping Design (2D, 3D - PDS) |
Doosan Heavy Ind. |
Structure Calculation |
11.12~12.01 |
Piping Design - Structure (2D) |
ILJIN ENERGY |
YULIN PP PRU Project |
11.12~12.01 |
Piping Design (2D) |
ILJIN ENERGY |
NDV Equipment Drawing Service |
11.12~12.01 |
Piping Design - Equipment Drawing (2D) |
IJPS |
Structure Design |
11.11~11.12 |
Piping Design - Structure (2D) |
IJPS |
INI BFG Pressure Part Drawing Service |
11.11~11.12 |
Pressure Part Detail Design |
Muhan Technical |
NDV Equipment Drawing Service |
11.11~11.12 |
Piping Design (2D) |
IJPS |