Project |
Period |
Content |
Client |
Doosan Heavy Ind. JBL Support Modeling |
09.04~09.06 |
Piping Support Design (PDS) |
JEONGWOO |
CEBU Pressure MAMBRANE Development Dwg |
09.04~09.04 |
3D Modeling (SolidEdge) & Planar Figure Work |
UNISON |
Doosan Heavy Ind. CAMPICHE Support Modeling |
09.03~09.07 |
Piping Support Design (PDS) |
UNISON |
Doosan Heavy Ind. ANGAMOS Support Modeling |
09.03~10.02 |
Piping Support Design (PDS) |
UNISON |
HEC Hyundai Oilbank HOU |
09.02~09.04 |
Pressure Part Drawing Work |
SeenTec |
Hoenam Petro. MMA Plant Watse Heat Boiler ECO Production PJT |
08.11~08.11 |
Pressure Part Detail Design |
SeenTec |
Taeahn Thermal Power #5 Boiler Water Wall Panel Production PJT |
08.10~08.11 |
Pressure Part Detail Design |
SeenTec |
Doosan Heavy Ind. MUNDRA Support Modeling |
08.10~08.12 |
Piping Support Design (PDS) |
UNISON |
Doosan Heavy Ind. GLOW Support Modeling (BOP) |
08.10~08.12 |
Piping Support Design (PDS) |
UNISON |
GS Caltex Ind. RFCC CO Boiler Economizer |
08.09~08.09 |
Pressure Part Detail Design |
SeenTec |
Namyangjoo BYEOLLAE CHP (Pressure Part) |
08.09~08.11 |
Pressure Part Detail Design |
SeenTec |
Doosan Heavy Ind. Nueva Ventanas Support Modeling |
08.09~08.10 |
Piping Support Design (PDS) |
UNISON |
Doosan Heavy Ind. GLOW Support Modeling (Boiler) |
08.08~08.09 |
Piping Support Design (PDS) |
UNISON |
LG Chemical Ind. Furnace Extension Project |
08.08~08.08 |
Pressure Part Detail Design |
SeenTec |
Daejon Steam Power LNG Fuel Change Remodeling PJT |
08.06~08.07 |
Pressure Part Detail Design |
SeenTec |