> Portfolio > Plant Engineering
Plant Engineering
Portfolio
Project |
Period |
Content |
Client |
Taeahn Thermal Power #5,6 Boiler Tube Inner Part Design Service |
11.09~11.12 |
Pressure Part Detail Design |
SeenTec |
LOYID Authentication Acquisition Inner Part Design |
11.09~11.11 |
Pressure Part Detail Design |
SeenTec |
Qurayyh Support Modeling (2~5 BLOCK) |
11.08~12.05 |
Support Modeling (PDS) |
WOOKWANG |
OPC Rotem Support Modeling |
11.08~11.09 |
Support Modeling (PDS) |
UNISON e Tech |
Yanbu2 Misc Piping |
11.07~12.11 |
Piping Design (2D, 3D - PDS) |
Doosan Heavy Ind. |
HHI Ulsan Incineration Plant Pressure Part Design |
11.06~11.09 |
Pressure Part Detail Design |
SeenTec |
Namyangjoo BYEOLLAE CHP Production PJT |
11.06~11.12 |
Pressure Part Detail Design |
SeenTec |
HRSG R-SPP2 Project THAILAND |
11.06~11.09 |
Pressure Part Detail Design |
SeenTec |
Poecheon Complex GT Piping Design Circumference Service |
11.06~13.02 |
Piping Design (2D, 3D - PDS) |
Doosan Heavy Ind. |
Gwanggyo HRSG Support Design Service |
11.06~11.12 |
Support Design |
SEONGHWA INDUSTRIAL |
GEREGU2 PJT Support Design Service |
11.06~11.12 |
Support Design |
SEONGHWA INDUSTRIAL |
CHILCA PJT Support Design Service |
11.06~11.12 |
Support Design |
SEONGHWA INDUSTRIAL |
KALLPA PJT ISO Marking Service |
11.05~11.06 |
Support Design |
SEONGHWA INDUSTRIAL |
KOREAZINC Steam Power Donkey Boiler Wall Tube Change PJT |
11.05~11.10 |
Pressure Part Detail Design |
SeenTec |
Yeosoo Group Energy Support Design Service |
11.03~11.08 |
Support Design |
SEONGHWA INDUSTRIAL |